![]() My Question is: - Who is employer in the above case? The PWD then prepares DPR/drawing design and issues contract to contractor. Even after construction, the road shall be owned by PWD and not by Company “X” ![]() no control over road completion time, drawing and design, construction site, sub-contractor, material procurement, manpower and quality of construction etc. 50 Cr with PWD with a condition that in case of final cost of project exceed the estimated amount, Company “X” shall deposit extra amount to cover the deficit and vice versa.Īs per the term of contract, Company “X” shall not have any control over road construction work i.e. PWD accepts the offer and makes an estimate of Rs. Since the road to be constructed is a public road, so its ownership shall vest with Government’s public work department (PWD).įor the construction of road on 100% contribution basis, company “X” approaches PWD. The road shall also be used by public as well. A Government Company “X” wants to construct a public road on Government’s land which will give approach to its factory.
0 Comments
Leave a Reply. |